Central Coast Council

CPA/2043 Design and Construction of SPS G6B Sewage Pumping Station & Gravity Sewer

This project involved the design and construction of a major new wastewater pumping and conveyance system at Gosford City Park, including a high-capacity sewage pumping station capable of pumping up to 230 L/s and approximately 160 m of DN525 gravity sewer connecting to the broader network. Key assets delivered included a new sewage pumping station, […]

CPA/2043 Design and Construction of SPS G6B Sewage Pumping Station & Gravity Sewer Read Post Ā»

CPA 6025 WWTW Desludging Oxidisation Tanks

CPA/6025 Woy Woy Treatment Works – Desludging Oxidisation Tanks

This project involved the desludging of multiple oxidation tanks at a major wastewater treatment facility, including sludge removal, dewatering, handling and disposal operations to restore treatment capacity and support ongoing plant performance. Key deliverables included the management of substantial sludge volumes, preparation of designated bunded processing areas, bathymetric surveying, and associated environmental and operational controls

CPA/6025 Woy Woy Treatment Works – Desludging Oxidisation Tanks Read Post Ā»

Toukley SPS T09 before

CPA/2291 Toukley SPS TO01, 06 & 09 Refurbishments

This project delivered the design and refurbishment of three sewage pumping stations, incorporating structural, mechanical and electrical upgrades to extend asset life, improve operational reliability and increase network capacity. Major deliverables included major refurbishment of wet wells, replacement of pumps and associated pipework, construction of new valve chambers, upgrades to power supply, switch rooms and

CPA/2291 Toukley SPS TO01, 06 & 09 Refurbishments Read Post Ā»

Thrust Bore under Showground Road

CPA/3616 Sewer Rising Main Replacement for SPS G8 & G9

This project delivered more than 1.6 km of new sewer rising main infrastructure between Gosford and Wyoming, including DN300 PVCO, DN355 PE and steel pipelines, a new gravity sewer connection, a barometric loop, and a new aqueduct piled foundation crossing of Brady’s Creek. The works also included major upgrades to the sewage pumping stations, incorporating

CPA/3616 Sewer Rising Main Replacement for SPS G8 & G9 Read Post Ā»

Mardi Treatment Works - Desludging

MardiĀ WTP Lagoon Desludging

Desludging and rehabilitation of a 37 ML treatment lagoon, including the excavation, drying, handling and off-site disposal of up to 28,000 m³ of water treatment residuals to prepare the facility for a major treatment plant upgrade. Key deliverables included construction of access ramps and drying beds, lagoon dewatering, sludge processing and haulage operations, surface water

MardiĀ WTP Lagoon Desludging Read Post Ā»

Failing lagoon bank - Mardi

Mardi Water Treatment PlantĀ – LagoonĀ EmbankmentĀ Stabilisation

Stabilisation and rehabilitation of a major water treatment plant sludge lagoon embankment, including large-scale earthworks, engineered fill placement and compaction, batter reconstruction, erosion control measures, and revegetation to restore long-term embankment integrity and performance. Deliverables included a realigned drainage channel, new embankment drainage systems, a reconstructed access road and road embankment, relocated fencing, and associated

Mardi Water Treatment PlantĀ – LagoonĀ EmbankmentĀ Stabilisation Read Post Ā»

Scroll to Top